London Stansted Airport - Standard 3 Upgrade Project

  • Writer: Gebler Tooth Architects
    Gebler Tooth Architects
  • Aug 27, 2020
  • 1 min read

Gebler Tooth Architects were appointed as the overall design integrator/coordinator for the STN Standard 3 Upgrade Project by BUK, who were the Principal Contractor for Stansted Airport.



The new “Autovar” baggage system at mezzanine level at Stansted Airport.


Gebler Tooth Architects were responsible for the coordination of the mezzanine walkways, lower and upper levels, lighting, services, containment coordination overall.