2012 Olympic Games Terminal, London Heathrow - De Boer UK.jpg

GTA provided the complete production design and construction support. Our Client was Ferrovial Construction.

Our client, Ferrovial Construction for Heathrow Airport Limited, delivered the Kilo Apron Development. It covered several projects across the Apron and in T2B which we were involved in.

T2 Kilo Box:

The scope of the project included the demolition of above-ground existing passenger connectors and the creation of a through taxi lane and two new Code F stands on the western face of Terminal 2 Satellite B, together with the construction of a subsurface enclosure for a future early bag store and baggage connectivity routes, and tunnels for a future passenger track transit rail system connecting T2A and T2B.

​The subsurface spaces will be fitted out in future when the extension of Terminal 2 is undertaken but have been equipped in their temporary state with servicing and life safety systems as required. Construction of the substructure has continued throughout the COVID-19 pandemic and is due for completion by the end of 2021.

​GTA acted as Lead Designer, Architect and Traffic Engineer for the project, from completion of Scheme Design to completion of construction and handover.

GET IN
TOUCH

+44 (0) 208 600 2800

  • White Instagram Icon
  • LinkedIn - White Circle
  • White Twitter Icon
RIBA logo
ARB Logo
BAB ISO 9001

©Gebler Tooth 2021. Two World Business Centre, Newall Road, TW6 2SF

Registered Office: Two World Business Centre, Newall Road, Hounslow, Middlesex, TW6 2SF

Gebler Associates Limited is a Limited Company registered in England and Wales

Company Registration Number – 01835047 

©GeblerToothArchitects
bottom of page