North Terminal Birmingham

Design and installation of ECAC Standard 3 HBS equipment and baggage system replacement in a live terminal environment.

Gebler Tooth have been managing the preparation of a 3D laser survey and pointcloud study with a fully integrated 3D model output. This will be used for detailed design, clash detection and phase planning.

We have also been engaged in the preparation of business case documentation for baggage system and support infrastructure specifications and performance requirements and the provision of Stakeholder engagement over the course of the project.

Location
Birmingham International Airport
Budget
£12m